Triple
T9671810
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dreadnought-class nuclear-powered ballistic missile submarines |
E234046
|
entity |
| Predicate | programmeCostEstimate |
P4259
|
FINISHED |
| Object | tens of billions of pounds sterling |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: tens of billions of pounds sterling | Statement: [Dreadnought-class nuclear-powered ballistic missile submarines, programmeCostEstimate, tens of billions of pounds sterling]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: programmeCostEstimate Context triple: [Dreadnought-class nuclear-powered ballistic missile submarines, programmeCostEstimate, tens of billions of pounds sterling]
-
A.
programCost
Indicates the monetary or resource expenditure required to implement, run, or participate in a particular program.
-
B.
estimatedCost
chosen
Indicates the predicted or calculated monetary amount expected to be required for something, such as a project, item, or action.
-
C.
programCostType
Indicates the type or category of cost associated with a program.
-
D.
humanCost
Indicates the extent of harm, suffering, or loss experienced by people as a consequence of an action, event, or decision.
-
E.
constructionCost
Indicates the monetary or resource expenditure required to build or construct something.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca848f55e48190b3f67252571c3d45 |
completed | March 30, 2026, 2:11 p.m. |
| NER | Named-entity recognition | batch_69cd9c6949108190b699442e5c2aacf9 |
completed | April 1, 2026, 10:30 p.m. |
| PD | Predicate disambiguation | batch_69ccd5b5d40c8190850ad7a351445f32 |
completed | April 1, 2026, 8:22 a.m. |
Created at: March 30, 2026, 8:15 p.m.