estimatedCost

P4259
predicate

Indicates the predicted or calculated monetary amount expected to be required for something, such as a project, item, or action.

All labels observed (55)

Label Occurrences
projectCost 31
estimatedCost canonical 27
renovationCost 24

Description generation (PDg)

The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.

Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning.  
# Instructions
Focus on describing the relationship, not the entities themselves. 
# Response Format
Begin the description with \' Indicates...\'
Input
Predicate: estimatedCost
Generated description
Indicates the predicted or calculated monetary amount expected to be required for something, such as a project, item, or action.

Sample triples (158)

Subject Object
Asian financial crisis of 1997–1998 hundreds of billions of US dollars in lost output ⓘ
CDFI Bond Guarantee Program low-cost via predicate surface "capitalCost" ⓘ
Master Settlement Agreement over 200 billion U.S. dollars over first 25 years via predicate surface "estimatedTotalPayments" ⓘ
1984 Super Bowl commercial $800,000 (approximate) via predicate surface "mediaBuyCost" ⓘ
1984 Super Bowl commercial about $1.7 million via predicate surface "totalCost" ⓘ
IBM System/360 over 5 billion US dollars (1960s) via predicate surface "estimatedDevelopmentCost" ⓘ
Reflecting Pool about 34 million US dollars via predicate surface "renovationCost" ⓘ
James Webb Space Telescope around 10 billion US dollars via predicate surface "costEstimate" ⓘ
Arrowhead Stadium approximately 375 million US dollars via predicate surface "renovationCost" ⓘ
Edsel 250000000 via predicate surface "estimatedDevelopmentCostUSD" ⓘ
Madison Square Garden approximately $1 billion (2011–2013 renovation) via predicate surface "renovationCost" ⓘ
Kauffman Stadium approximately 250 million US dollars via predicate surface "renovationCost" ⓘ
Comprehensive Everglades Restoration Plan tens of billions of U.S. dollars ⓘ
Hurricane Katrina over 100000000000 via predicate surface "estimatedEconomicDamage_USD" ⓘ
Hurricane Katrina about 125000000000 via predicate surface "estimatedEconomicDamage_USD" ⓘ
Tottenham Hotspur Stadium £1 billion+ via predicate surface "constructionCostApprox" ⓘ
2014 Winter Olympics approximately 50 billion US dollars ⓘ
Rocket Mortgage FieldHouse approximately 185 million US dollars via predicate surface "renovationCost" ⓘ
Gwynt y Môr Wind Farm about 2 billion pounds sterling via predicate surface "projectCost" ⓘ
Gwynt y Môr Wind Farm about £2 billion via predicate surface "projectCost" ⓘ
Bramley-Moore Dock stadium development hundreds of millions of pounds ⓘ
Kyle Field approximately 485 million US dollars via predicate surface "renovationCost" ⓘ
Mars Orbiter Mission 73000000 via predicate surface "approximateCostUSD" ⓘ
Mars Orbiter Mission 4500000000 via predicate surface "approximateCostINR" ⓘ
Fiserv Forum approximately US$524 million via predicate surface "projectCost" ⓘ
Elizabeth line approximately £18.9 billion via predicate surface "constructionCostEstimate" ⓘ
Grand Central Birmingham £150 million (approximate) via predicate surface "redevelopmentCost" ⓘ
City Hall (Pasadena) approximately 117 million US dollars via predicate surface "renovationCost" ⓘ
Dr. Phillips Center for the Performing Arts approximately US$500 million (multiple phases) via predicate surface "projectCost" ⓘ
Purvanchal Expressway 22500 via predicate surface "estimatedProjectCostInINRCrore" ⓘ
Bundelkhand Expressway 14850 via predicate surface "projectCostInINRCrore" ⓘ
Queensferry Crossing about £1.35 billion via predicate surface "projectCost" ⓘ
Hyderabad Metro multi-billion-rupee project via predicate surface "projectCost" ⓘ
Broadcasting House £1 billion (approximate) via predicate surface "redevelopmentCost" ⓘ
Saint Helena Airport approximately £285 million via predicate surface "projectCost" ⓘ
Three Gorges Dam about US$30 billion via predicate surface "constructionCostEstimate" ⓘ
China–Pakistan Economic Corridor 46000000000 via predicate surface "estimatedInitialValueUSD" ⓘ
China–Pakistan Economic Corridor 62000000000 via predicate surface "estimatedLaterValueUSD" ⓘ
Big Dig over 20 billion US dollars via predicate surface "costIncludingInterest" ⓘ
Cobo Center approximately $279 million via predicate surface "renovationCost" ⓘ
Atatürk Dam approximately US$1.25 billion via predicate surface "projectCost" ⓘ
Dubai Water Canal 2000000000 AED ⓘ
Marble House about $11 million (1890s dollars) via predicate surface "estimatedConstructionCost" ⓘ
Marble House about $7 million (1890s dollars) via predicate surface "estimatedConstructionCostForMarble" ⓘ
Chenab Rail Bridge over ₹1400 crore via predicate surface "projectCost" ⓘ
Saville Inquiry about £195 million ⓘ
Royal Shakespeare Theatre approximately £112 million via predicate surface "redevelopmentCost" ⓘ
Russky Bridge over 1 billion USD equivalent via predicate surface "projectCost" ⓘ
Russky Bridge over 30 billion rubles via predicate surface "projectCost" ⓘ
MOSE flood barrier system several billion euros ⓘ