Triple

T38003800
Position Surface form Disambiguated ID Type / Status
Subject Colorado transportation planning framework E948175 entity
Predicate includesComponent P1393 FINISHED
Object Statewide Transportation Plan
The Statewide Transportation Plan is Colorado’s long-range, comprehensive strategy for guiding investment and policy decisions across all modes of transportation throughout the state.
E2251215 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Statewide Transportation Plan | Statement: [Colorado transportation planning framework, includesComponent, Statewide Transportation Plan]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Statewide Transportation Plan
Triple: [Colorado transportation planning framework, includesComponent, Statewide Transportation Plan]
Generated description
The Statewide Transportation Plan is Colorado’s long-range, comprehensive strategy for guiding investment and policy decisions across all modes of transportation throughout the state.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76efb4b10819092c8c2ba28ac06a8 completed May 3, 2026, 3:51 p.m.
NER Named-entity recognition batch_69fbc93e31308190a4ce6a3f4060ea76 completed May 6, 2026, 11:05 p.m.
NED1 Entity disambiguation (via context triple) batch_6a412cc536f481909dfd7610d64086a3 completed June 28, 2026, 2:16 p.m.
NEDg Description generation batch_6a41324e591481908f5aef57c6329553 completed June 28, 2026, 2:40 p.m.
NED2 Entity disambiguation (via description) batch_6a41346459e48190a9f83a5d2cbb3c98 completed June 28, 2026, 2:49 p.m.
Created at: May 3, 2026, 4:20 p.m.