Triple

T11798633
Position Surface form Disambiguated ID Type / Status
Subject UTDC ICTS Mark I E280566 entity
Predicate successor P78 FINISHED
Object UTDC ICTS Mark II E280566 NE FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: UTDC ICTS Mark II
Context triple: [UTDC ICTS Mark I, successor, UTDC ICTS Mark II]
  • A. UTDC ICTS Mark I chosen
    The UTDC ICTS Mark I is a first-generation intermediate-capacity rapid transit car design developed by the Urban Transportation Development Corporation, notable for its automated, linear-induction-motor technology used on systems like Toronto’s Scarborough RT.
  • B. UTDC ICTS Mark I vehicles
    UTDC ICTS Mark I vehicles are early-generation, fully automated, lightweight rapid transit cars used on systems like Toronto’s Scarborough RT.
  • C. Nevis Laboratory
    Nevis Laboratory is a Columbia University physics research facility known for pioneering nuclear and particle physics experiments, including landmark tests of fundamental symmetries.
  • D. Taishan 2, China
    Taishan 2 in China is a nuclear power reactor unit that uses the EPR (European Pressurized Reactor) design as part of the Taishan Nuclear Power Plant.
  • E. Phystech System
    Phystech System is a rigorous, research-oriented educational model used at the Moscow Institute of Physics and Technology that tightly integrates students into leading scientific laboratories and real-world research from early in their studies.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab258b808190b1735835c841e3a4 completed April 8, 2026, 7:23 p.m.
NED1 Entity disambiguation (via context triple) batch_6a037c1792a081909cce0eb4cd1d6870 completed May 12, 2026, 7:14 p.m.
Created at: April 8, 2026, 9:42 p.m.