Triple

T11798599
Position Surface form Disambiguated ID Type / Status
Subject UTDC ICTS Mark I E280566 entity
Predicate manufacturer P490 FINISHED
Object Urban Transportation Development Corporation E280560 NE FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Urban Transportation Development Corporation
Context triple: [UTDC ICTS Mark I, manufacturer, Urban Transportation Development Corporation]
  • A. Urban Transportation Development Corporation chosen
    Urban Transportation Development Corporation was a Canadian government-owned company that specialized in designing and manufacturing advanced urban transit systems, including automated light rail vehicles.
  • B. Triangle Transit Authority
    Triangle Transit Authority was the former name of GoTriangle, the regional public transit agency serving North Carolina’s Research Triangle area.
  • C. Metropolitan Transit Corporation
    The Metropolitan Transit Corporation was the former public transit agency that operated bus services in King County, Washington, before being succeeded by King County Metro.
  • D. Gary Public Transportation Corporation
    Gary Public Transportation Corporation is the primary public transit agency for Gary, Indiana, operating local bus services and related transportation within the city and surrounding areas.
  • E. Transportation Investment Corporation
    Transportation Investment Corporation is a British Columbia Crown corporation responsible for overseeing and managing major transportation infrastructure projects and tolling operations in the province.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab258b808190b1735835c841e3a4 completed April 8, 2026, 7:23 p.m.
NED1 Entity disambiguation (via context triple) batch_6a03852b80788190b1c83f9b9f755937 completed May 12, 2026, 7:53 p.m.
Created at: April 8, 2026, 9:42 p.m.