Nationally Significant Infrastructure Projects

E716605

Nationally Significant Infrastructure Projects are large-scale developments in areas like energy, transport, water, and waste in the UK that follow a special fast-track planning and consent regime due to their national importance.

All labels observed (1)

Label Occurrences
Nationally Significant Infrastructure Projects canonical 1

How this entity was disambiguated

Statements (58)

Predicate Object
instanceOf infrastructure planning designation ⓘ
planning regime category ⓘ
administeredBy Planning Inspectorate ⓘ
alsoKnownAs NSIPs ⓘ
applicationSubmittedTo Planning Inspectorate ⓘ
applicationType development consent order application ⓘ
appliesToJurisdiction England ⓘ
Wales ⓘ
characteristic large scale ⓘ
national importance ⓘ
statutory timetables for examination and decision ⓘ
threshold-based criteria ⓘ
country United Kingdom ⓘ
decisionMaker Secretary of State ⓘ
decisionMakerRole grants or refuses development consent order ⓘ
governedBy Planning Act 2008 ⓘ
hasProcessStage acceptance ⓘ
decision ⓘ
examination ⓘ
post-decision ⓘ
pre-application ⓘ
pre-examination ⓘ
recommendation ⓘ
hasPurpose fast-track consent for nationally important infrastructure ⓘ
includes airports (over certain thresholds) ⓘ
harbours and ports ⓘ
hazardous waste facilities above thresholds ⓘ
large water transfer schemes ⓘ
large wind farms ⓘ
major electricity transmission lines ⓘ
major power stations ⓘ
major roads ⓘ
railway lines ⓘ
waste water treatment works above thresholds ⓘ
introducedInYear 2008 ⓘ
legalBasis Part 3 of the Planning Act 2008 ⓘ
planningRegimeType consent regime separate from Town and Country Planning Act 1990 ⓘ
policyFramework National Policy Statement for Airports (where applicable) ⓘ
National Policy Statement for Energy ⓘ
National Policy Statement for National Networks ⓘ
National Policy Statement for Ports ⓘ
regulatedBy National Policy Statements ⓘ
relatedConcept development consent order regime ⓘ
major infrastructure planning ⓘ
requires development consent order ⓘ
environmental impact assessment where applicable ⓘ
habitats regulations assessment where applicable ⓘ
pre-application consultation ⓘ
sector business and commercial (limited circumstances) ⓘ
energy ⓘ
hazardous waste ⓘ
transport ⓘ
waste ⓘ
waste water ⓘ
water ⓘ
timeLimit six months for examination stage ⓘ
three months for Secretary of State decision after recommendation ⓘ
website https://infrastructure.planninginspectorate.gov.uk/ ⓘ

How these facts were elicited

Referenced by (1)

Full triples — surface form annotated when it differs from this entity's canonical label.

United Kingdom planning law → keyConcept → Nationally Significant Infrastructure Projects ⓘ