Kemper Project power plant

E533457

The Kemper Project power plant is a controversial, partially abandoned integrated gasification combined cycle (IGCC) power facility in Mississippi that became known for massive cost overruns and the failure of its “clean coal” technology ambitions.

All labels observed (1)

Label Occurrences
Kemper Project power plant canonical 1

How this entity was disambiguated

Statements (49)

Predicate Object
instanceOf energy infrastructure project ⓘ
integrated gasification combined cycle power plant ⓘ
power plant ⓘ
actualGasificationAbandonmentDate 2017 ⓘ
announced around 2006 ⓘ
constructionStartDate 2010 ⓘ
costOverrun more than 4 billion US dollars above initial estimate ⓘ
country United States ⓘ
criticizedFor being an example of clean coal technology risk ⓘ
high costs to consumers ⓘ
technical failures of gasification system ⓘ
currentPrimaryFuel natural gas ⓘ
designedToCapture carbon dioxide ⓘ
designedToSell captured carbon dioxide for enhanced oil recovery ⓘ
designedToUse locally mined lignite ⓘ
environmentalClaim intended to significantly reduce CO2 emissions compared to conventional coal plants ⓘ
estimatedFinalCost over 7 billion US dollars ⓘ
estimatedInitialCost approximately 2.4 billion US dollars ⓘ
fuelTypePlanned lignite coal ⓘ
natural gas ⓘ
gasificationTechnologyDeveloper KBR ⓘ
Southern Company ⓘ
gasificationTechnologyType transport integrated gasification (TRIG) ⓘ
hasPlannedCapacity about 582 MW net electric output ⓘ
approximately 582 megawatts ⓘ
hasProjectType clean coal project ⓘ
demonstration project ⓘ
initialPlannedCompletion 2014 ⓘ
locatedIn Kemper County, Mississippi ⓘ
Mississippi ⓘ
United States ⓘ
notableFor construction delays ⓘ
controversy over ratepayer costs ⓘ
failure of gasification and carbon capture systems to enter commercial operation ⓘ
massive cost overruns ⓘ
originalConcept clean coal power plant with carbon capture ⓘ
ownedBy Mississippi Power ⓘ
parentCompanyOfOwner Southern Company ⓘ
receivedFederalSupportFrom U.S. Department of Energy ⓘ
receivedFederalSupportType clean coal demonstration funding ⓘ
regulator Mississippi Public Service Commission ⓘ
regulatoryOutcome Mississippi Public Service Commission ordered end of coal gasification portion in 2017 ⓘ
status operates as natural gas combined cycle plant only ⓘ
partially abandoned ⓘ
technologyType carbon capture and storage ⓘ
integrated gasification combined cycle ⓘ
usedAsCaseStudyIn economic viability of clean coal technologies ⓘ
energy policy debates ⓘ
project management failures in large infrastructure ⓘ

How these facts were elicited

Referenced by (1)

Full triples — surface form annotated when it differs from this entity's canonical label.

Kemper County, Mississippi → containsFacility → Kemper Project power plant ⓘ