BART Silicon Valley extension

E393030

The BART Silicon Valley extension is a major Bay Area Rapid Transit project extending rail service into Santa Clara County, including new stations in San José and surrounding areas.

All labels observed (7)

How this entity was disambiguated

Statements (48)

Predicate Object
instanceOf Bay Area Rapid Transit extension
public transit expansion project
rail infrastructure project
beneficiary Bay Area regional travelers
commuters in Silicon Valley
residents of Santa Clara County
connectsFrom Alameda County, California
linked to: Alameda County
connectsTo Santa Clara County, California
linked to: Santa Clara County
connectsWith Caltrain
Santa Clara Valley Transportation Authority
VTA bus network
VTA light rail
country United States of America
electrification third rail electrification
fundedBy federal transit grants
local sales tax measures
state transportation funds
goal integrate regional rail and local transit in Santa Clara County
provide direct BART access to downtown San José
hasPart Berryessa/North San José station
Diridon station
linked to: Diridon Station

Downtown San José station
Milpitas station
Santa Clara station
includes at-grade track segments
elevated track segments
subway segments in San José
involves construction of new BART stations
construction of new BART track
locatedIn San Francisco Bay Area
San José, California
linked to: San Jose

Santa Clara County, California
linked to: Santa Clara County
modeOfTransport heavy rail
operator Bay Area Rapid Transit District
partOf BART system
linked to: BART
planningAgency Santa Clara Valley Transportation Authority
primaryCityServed San José, California
linked to: San Jose
projectType multi-phase transit project
purpose extend BART service into Silicon Valley
improve regional transit connectivity
reduce automobile dependence in Santa Clara County
railGauge standard gauge
regionServed Silicon Valley
South Bay
secondaryCityServed Milpitas, California NERFINISHED
Santa Clara, California
trackType grade-separated
usesRollingStock BART electric multiple units
linked to: BART

How these facts were elicited

Referenced by (14)

Full triples — surface form annotated when it differs from this entity's canonical label.

Berryessa/North San José station partOfLine BART Silicon Valley extension
Berryessa/North San José station partOfLine Silicon Valley BART Phase I
linked to: BART Silicon Valley extension
Berryessa/North San José station terminusOf BART Silicon Valley Phase I
linked to: BART Silicon Valley extension
Richmond–Millbrae line usesInfrastructure BART Peninsula extension
linked to: BART Silicon Valley extension
Warm Springs/South Fremont station partOfLine BART Warm Springs Extension
linked to: BART Silicon Valley extension
Warm Springs/South Fremont station isTerminusOf BART Warm Springs Extension
linked to: BART Silicon Valley extension
Downtown San Jose plannedToBeServedBy BART Silicon Valley extension
Diridon Station futureService BART Silicon Valley extension
Colma BART station partOf BART Peninsula extension
linked to: BART Silicon Valley extension
Berryessa Transit Center partOf BART Silicon Valley extension
North San José neighborhood transportationInfrastructure BART Silicon Valley extension
Milpitas station partOf BART Silicon Valley extension
Milpitas station isPartOfProject BART to Silicon Valley Phase I
linked to: BART Silicon Valley extension
BART Green Line isPartOfExpansion Silicon Valley BART extension
linked to: BART Silicon Valley extension