Triple

T9888327
Position Surface form Disambiguated ID Type / Status
Subject Yaesu side building E181392 entity
Predicate instanceOf P0 FINISHED
Object commercial and transportation complex C26597 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: commercial and transportation complex
Context triple: [Yaesu side building, instanceOf, commercial and transportation complex]
  • A. commercial and residential complex
    A commercial and residential complex is a mixed-use development that integrates living spaces with retail, office, and service facilities within a unified property or group of buildings.
  • B. combined civic building and transportation hub
    A combined civic building and transportation hub is a multifunctional public facility that integrates government or community services with major transit infrastructure to centralize access, improve connectivity, and enhance urban efficiency.
  • C. civic building complex
    A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
  • D. institutional building complex
    An institutional building complex is a coordinated group of structures and shared spaces designed to support the functions, services, and administration of an organization such as a university, hospital, or government entity.
  • E. mixed-use skyscraper complex
    A mixed-use skyscraper complex is a vertically integrated high-rise development that combines residential, commercial, office, and often recreational or civic functions within a unified architectural and infrastructural framework.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8283a6708190801af7a25a7ebb9f completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 8:39 p.m.