Triple

T988491
Position Surface form Disambiguated ID Type / Status
Subject Shirley Highway E21332 entity
Predicate instanceOf P0 FINISHED
Object freeway C3788 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: freeway
Context triple: [Shirley Highway, instanceOf, freeway]
  • A. highway
    A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
  • B. motorway chosen
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • C. toll road
    A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
  • D. road
    A road is a prepared surface or pathway designed for the movement of vehicles, pedestrians, or animals between different locations.
  • E. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493c383dc8190a03257f22d4b4183 completed March 1, 2026, 7:30 p.m.
Created at: March 1, 2026, 7:41 p.m.