Triple
T9773677
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | East Stour |
E237190
|
entity |
| Predicate | hasBridge |
P386
|
FINISHED |
| Object | High Speed 1 rail bridge near Ashford |
E768378
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: High Speed 1 rail bridge near Ashford | Statement: [East Stour, hasBridge, High Speed 1 rail bridge near Ashford]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: High Speed 1 rail bridge near Ashford Context triple: [East Stour, hasBridge, High Speed 1 rail bridge near Ashford]
-
A.
London to Folkestone high-speed line
chosen
The London to Folkestone high-speed line is a major UK railway route, largely used by Eurostar and domestic high-speed services, that connects London with the Channel Tunnel and the Kent coast.
-
B.
Chiltern Link
Chiltern Link is a long-distance walking trail that runs through the scenic countryside of the Chilterns in southern England.
-
C.
Humber Bridge (nearby)
The Humber Bridge is a major suspension bridge in northern England that spans the Humber Estuary, linking East Yorkshire with North Lincolnshire and serving as an iconic regional landmark.
-
D.
Elizabeth line
The Elizabeth line is a major high-capacity railway route across London and its surroundings, forming part of the Crossrail project and providing fast east–west connections through the city.
-
E.
London–Bristol rail corridor
The London–Bristol rail corridor is a major intercity railway route in England linking the capital with the city of Bristol via key intermediate towns and lines.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84d975a08190aab25b02a89bdab3 |
completed | March 30, 2026, 2:12 p.m. |
| NER | Named-entity recognition | batch_69cda0f6b8348190bd05b94519de9bc9 |
completed | April 1, 2026, 10:49 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d1bd18542881908860f9e8e3927f23 |
completed | April 5, 2026, 1:38 a.m. |
Created at: March 30, 2026, 8:26 p.m.