Triple
T9721411
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lancang River |
E235481
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | upper course of the Mekong River |
C79
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: upper course of the Mekong River Context triple: [Lancang River, instanceOf, upper course of the Mekong River]
-
A.
distributary of the Nile
A distributary of the Nile is a branch of the river that diverges from the main channel in its delta region, carrying water and sediment toward the Mediterranean Sea.
-
B.
river
chosen
A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
-
C.
river basin
A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
-
D.
plain of China
The plain of China is a vast, low-lying expanse of fertile land, primarily in eastern China, that supports dense populations and intensive agriculture.
-
E.
arm of the South China Sea
An arm of the South China Sea is a subsidiary extension or inlet of the main sea body, partially enclosed by surrounding landmasses and connected to the larger South China Sea.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84d0123c819096f9dc3b6abb0881 |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 8:20 p.m.