Triple
T9672697
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | California principal meridian network |
E234067
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | land survey reference system |
C9448
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: land survey reference system Context triple: [California principal meridian network, instanceOf, land survey reference system]
-
A.
cadastral survey system
A cadastral survey system is a coordinated framework of tools, processes, and records used to accurately measure, map, and manage land parcel boundaries, ownership, and related legal rights.
-
B.
geodetic survey
A geodetic survey is a precise method of measuring and mapping large areas of the Earth's surface that accounts for its curvature and gravitational variations to establish accurate positions, elevations, and reference frameworks.
-
C.
GNSS reference network
chosen
A GNSS reference network is a coordinated system of continuously operating GNSS stations that provide precise, stable positioning and timing references for surveying, navigation, and geospatial applications.
-
D.
land surveying examination
A land surveying examination is a formal assessment that tests a candidate’s knowledge, skills, and competency in surveying principles, practices, laws, and standards required for professional licensure or certification.
-
E.
geodetic reference point
A geodetic reference point is a precisely surveyed physical location on the Earth's surface used as a fixed coordinate reference for mapping, surveying, and geospatial measurements.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca848f55e48190b3f67252571c3d45 |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 8:15 p.m.