Triple
T9672427
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Los Angeles–Las Vegas route |
E234060
|
entity |
| Predicate | primaryHighwayComponent |
P89540
|
FINISHED |
| Object | Interstate 15 |
E42837
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 15 | Statement: [Los Angeles–Las Vegas route, primaryHighwayComponent, Interstate 15]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Interstate 15 Context triple: [Los Angeles–Las Vegas route, primaryHighwayComponent, Interstate 15]
-
A.
Interstate 15
chosen
Interstate 15 is a major north–south U.S. highway running from Southern California through the Intermountain West to the Canadian border, serving key cities such as Las Vegas and Salt Lake City.
-
B.
Interstate 11
Interstate 11 is a developing north–south U.S. Interstate Highway intended to connect the Las Vegas area in Nevada with Phoenix in Arizona and potentially extend further to create a major regional transportation corridor.
-
C.
Interstate 25
Interstate 25 is a major north–south U.S. highway running through the Rocky Mountain region, connecting cities from New Mexico through Colorado to Wyoming.
-
D.
Interstate 105
Interstate 105 is a major east–west freeway in Los Angeles County that connects Los Angeles International Airport to the I-605 corridor and other regional highways.
-
E.
Interstate 40
Interstate 40 is a major east–west transcontinental highway in the United States that stretches from California to North Carolina, passing through several key cities and states.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: primaryHighwayComponent Context triple: [Los Angeles–Las Vegas route, primaryHighwayComponent, Interstate 15]
-
A.
primaryInterstateHighway
Indicates that the subject is designated as a primary (main) interstate highway within the interstate highway system.
-
B.
isPrimaryStateHighway
Indicates that a given road segment is designated as a primary (major) state highway within a state’s road network.
-
C.
connectsToHighway
Indicates that one location, road, or route has a direct access point or linkage to a highway.
-
D.
hasMajorHighway
Indicates that a location or area is served by or directly connected to a major highway route.
-
E.
motorwayServedBy
Indicates that a motorway is connected to or accessed by a particular service facility, route, or transport service.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca848f55e48190b3f67252571c3d45 |
completed | March 30, 2026, 2:11 p.m. |
| NER | Named-entity recognition | batch_69cd9c6aa01c819083fc758470096ec2 |
completed | April 1, 2026, 10:30 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d1d58be8a4819088c419888a879e3e |
completed | April 5, 2026, 3:22 a.m. |
| PD | Predicate disambiguation | batch_69ccd5b5d40c8190850ad7a351445f32 |
completed | April 1, 2026, 8:22 a.m. |
| PDg | Predicate description generation | batch_69ccd9408c848190b84dd74d87f76273 |
completed | April 1, 2026, 8:37 a.m. |
Created at: March 30, 2026, 8:15 p.m.