Triple
T9652370
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bureau of Bridge Design of the New Hampshire Department of Transportation |
E233366
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge design bureau |
C25896
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge design bureau Context triple: [Bureau of Bridge Design of the New Hampshire Department of Transportation, instanceOf, bridge design bureau]
-
A.
bridge design standard
A bridge design standard is a formal set of technical requirements, guidelines, and criteria that govern the safe, durable, and efficient planning, analysis, and construction of bridges.
-
B.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
-
C.
bridge builder
A bridge builder is a professional responsible for designing, planning, and constructing bridges that safely span physical obstacles such as rivers, valleys, or roads.
-
D.
reinforced-concrete bridge
A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely carry and distribute loads across a span.
-
E.
reinforced-concrete bridge
A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely span obstacles and carry traffic loads over a defined distance.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca848b31648190b57aa55da20285be |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 8:13 p.m.