Triple

T9652261
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 29 in Florida E233363 entity
Predicate abbreviation P43 FINISHED
Object US 29 E758408 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: US 29 | Statement: [U.S. Route 29 in Florida, abbreviation, US 29]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: US 29
Context triple: [U.S. Route 29 in Florida, abbreviation, US 29]
  • A. US 29 chosen
    US 29 is a major north–south U.S. Highway running through the eastern United States, connecting cities from Florida to Virginia and beyond.
  • B. US 23
    US 23 is a major north–south United States highway running from Florida to Michigan, serving as an important regional transportation corridor.
  • C. US 9
    US 9 is a major north–south U.S. Highway running along the East Coast, primarily through New Jersey and New York, connecting urban, suburban, and coastal communities.
  • D. US 209
    US 209 is a U.S. highway running through Pennsylvania and New York, connecting rural communities, small towns, and scenic areas in the northeastern United States.
  • E. US 99
    US 99 was a major former north–south U.S. highway that ran along the West Coast, primarily through California, and served as a key predecessor to parts of today’s Interstate 5.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848b31648190b57aa55da20285be completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9bb0cce88190b7eacc8b43450d7f completed April 1, 2026, 10:26 p.m.
NED1 Entity disambiguation (via context triple) batch_69d1826c91388190b82112c2ca1eae7e completed April 4, 2026, 9:28 p.m.
Created at: March 30, 2026, 8:13 p.m.