Triple

T9647471
Position Surface form Disambiguated ID Type / Status
Subject Washington State Route 6 E233240 entity
Predicate easternTerminus P388 FINISHED
Object Interstate 5 in Chehalis, Washington
Interstate 5 in Chehalis, Washington is a major north–south freeway segment of the West Coast’s primary interstate corridor, serving as a key transportation route through the city and connecting it to regional and interstate destinations.
E811717 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 5 in Chehalis, Washington | Statement: [Washington State Route 6, easternTerminus, Interstate 5 in Chehalis, Washington]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 5 in Chehalis, Washington
Context triple: [Washington State Route 6, easternTerminus, Interstate 5 in Chehalis, Washington]
  • A. Interstate 5 in Vancouver, Washington
    Interstate 5 in Vancouver, Washington is a major north–south freeway segment of the West Coast’s primary interstate corridor, connecting the city to Portland, Oregon across the Columbia River and to the broader I-5 route through Washington state.
  • B. Interstate 5 in Oregon
    Interstate 5 in Oregon is the primary north–south freeway traversing the state, connecting major cities from the California border to Washington and serving as a key corridor for regional and interstate travel.
  • C. Interstate 5 near Salmon Creek, Washington
    Interstate 5 near Salmon Creek, Washington is a major north–south freeway segment in southwestern Washington that serves as a key junction where traffic from Interstate 205 merges back into the primary I-5 corridor.
  • D. Interstate 5 in Federal Way
    Interstate 5 in Federal Way is a major segment of the primary north–south interstate highway in Washington State, serving as a key transportation corridor through the city of Federal Way between Seattle and Tacoma.
  • E. Interstate 5 in Redding
    Interstate 5 in Redding is a major north–south freeway corridor in Northern California that serves as a key transportation route through the city and connects it to regional and interstate destinations.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 5 in Chehalis, Washington
Triple: [Washington State Route 6, easternTerminus, Interstate 5 in Chehalis, Washington]
Generated description
Interstate 5 in Chehalis, Washington is a major north–south freeway segment of the West Coast’s primary interstate corridor, serving as a key transportation route through the city and connecting it to regional and interstate destinations.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate 5 in Chehalis, Washington
Target entity description: Interstate 5 in Chehalis, Washington is a major north–south freeway segment of the West Coast’s primary interstate corridor, serving as a key transportation route through the city and connecting it to regional and interstate destinations.
  • A. Interstate 5 in Vancouver, Washington
    Interstate 5 in Vancouver, Washington is a major north–south freeway segment of the West Coast’s primary interstate corridor, connecting the city to Portland, Oregon across the Columbia River and to the broader I-5 route through Washington state.
  • B. Interstate 5 in Oregon
    Interstate 5 in Oregon is the primary north–south freeway traversing the state, connecting major cities from the California border to Washington and serving as a key corridor for regional and interstate travel.
  • C. Interstate 5 near Salmon Creek, Washington
    Interstate 5 near Salmon Creek, Washington is a major north–south freeway segment in southwestern Washington that serves as a key junction where traffic from Interstate 205 merges back into the primary I-5 corridor.
  • D. Interstate 5 in Federal Way
    Interstate 5 in Federal Way is a major segment of the primary north–south interstate highway in Washington State, serving as a key transportation corridor through the city of Federal Way between Seattle and Tacoma.
  • E. Interstate 5 in Redding
    Interstate 5 in Redding is a major north–south freeway corridor in Northern California that serves as a key transportation route through the city and connects it to regional and interstate destinations.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848b31648190b57aa55da20285be completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9b826ff08190a972bdef84405f08 completed April 1, 2026, 10:26 p.m.
NED1 Entity disambiguation (via context triple) batch_69d1825dc8e08190bfc3475cd2e694ba completed April 4, 2026, 9:27 p.m.
NEDg Description generation batch_69d1837ec5548190a06458227fec2237 completed April 4, 2026, 9:32 p.m.
NED2 Entity disambiguation (via description) batch_69d183ea286c8190979d1429729f8abd completed April 4, 2026, 9:34 p.m.
Created at: March 30, 2026, 8:13 p.m.