Triple
T9642416
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | McClure Basin |
E233104
|
entity |
| Predicate | createdBy |
P806
|
FINISHED |
| Object | McClure Dam |
E233104
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: McClure Dam | Statement: [McClure Basin, createdBy, McClure Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: McClure Dam Context triple: [McClure Basin, createdBy, McClure Dam]
-
A.
McClure Dam
chosen
McClure Dam is a hydroelectric dam on the Dead River in Michigan, forming McClure Basin and providing power and water management for the surrounding region.
-
B.
LaBarge Dam
LaBarge Dam is a small hydroengineering structure located on the Thornapple River in Michigan, used primarily for water level control and local recreation.
-
C.
Chatfield Dam
Chatfield Dam is a large flood-control and water-storage structure in Colorado that creates Chatfield Reservoir on the South Platte River near Denver.
-
D.
Merwin Dam
Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
-
E.
Goodwin Dam
Goodwin Dam is a concrete gravity diversion dam on California’s Stanislaus River that helps regulate river flow and supplies irrigation water to surrounding agricultural areas.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca848a5a908190aad251f4137b0c3a |
completed | March 30, 2026, 2:11 p.m. |
| NER | Named-entity recognition | batch_69cd9b7cda388190a38f96d78085f404 |
completed | April 1, 2026, 10:26 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d380c81c7c81908361d237d79f1ff0 |
completed | April 6, 2026, 9:45 a.m. |
Created at: March 30, 2026, 8:12 p.m.