Triple
T9602127
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Capital Master Plan |
E231874
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure modernization program |
C14043
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure modernization program Context triple: [Capital Master Plan, instanceOf, infrastructure modernization program]
-
A.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
B.
railway modernisation project
A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
-
C.
modernization package
A modernization package is a bundled set of upgrades, tools, and services designed to update an existing system, product, or infrastructure to contemporary standards in performance, usability, and maintainability.
-
D.
public transit and highway improvement program
chosen
A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
-
E.
infrastructure
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8484838c8190b2049199d22fef70 |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 8:08 p.m.