Triple

T9592042
Position Surface form Disambiguated ID Type / Status
Subject USNS E231443 entity
Predicate notOperatedBy P63047 FINISHED
Object commissioned warships — LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: commissioned warships | Statement: [USNS, notOperatedBy, commissioned warships]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: notOperatedBy
Context triple: [USNS, notOperatedBy, commissioned warships]
  • A. operatedWithout
    Indicates that an action, process, or entity functioned or was carried out in the absence of a specified resource, condition, or participant.
  • B. notManagedBy chosen
    Indicates that an entity is explicitly not under the control, supervision, or administrative responsibility of the specified manager or managing entity.
  • C. isOperatedIn
    Indicates that an entity carries out its operations or activities within a specified location, region, or jurisdiction.
  • D. doesNotOperate
    Indicates that an entity is not functioning, active, or performing its intended operation in relation to another entity or context.
  • E. mayBeOperatedBy
    Indicates that an entity has the potential or permission to be operated, controlled, or run by another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8482884481908eccdfdf64d6fbf7 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9a10b85881908bfc783dcb7170aa completed April 1, 2026, 10:20 p.m.
PD Predicate disambiguation batch_69ccd5a359788190b24f82399489f7fe completed April 1, 2026, 8:21 a.m.
Created at: March 30, 2026, 8:06 p.m.