Triple
T9589696
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Highway Freight Program |
E231384
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | United States freight program |
C26788
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: United States freight program Context triple: [National Highway Freight Program, instanceOf, United States freight program]
-
A.
freight railroad network
A freight railroad network is an interconnected system of rail lines, terminals, and supporting infrastructure designed to transport goods and raw materials efficiently between industrial, commercial, and logistical hubs.
-
B.
airlift program
An airlift program is an organized operation that uses aircraft to rapidly transport people, equipment, or supplies—often in response to emergencies, military needs, or humanitarian crises.
-
C.
freight railroad
A freight railroad is a rail transport system dedicated to moving goods and commodities—such as raw materials, manufactured products, and containers—using freight trains over a network of tracks.
-
D.
freight rail corridor
A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
-
E.
National Transportation Safety Board program
A National Transportation Safety Board program is an organized set of activities, policies, and resources designed to investigate transportation accidents, analyze safety data, and implement recommendations to improve national transportation safety.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8482884481908eccdfdf64d6fbf7 |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 8:06 p.m.