Triple
T9589600
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Highway Safety Improvement Program |
E231382
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | highway safety funding program |
C10079
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: highway safety funding program Context triple: [Highway Safety Improvement Program, instanceOf, highway safety funding program]
-
A.
highway funding program
chosen
A highway funding program is a structured governmental initiative that allocates financial resources for the planning, construction, maintenance, and improvement of highway infrastructure.
-
B.
public transit and highway improvement program
A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
-
C.
highway law
Highway law is the body of legal rules and regulations governing the construction, maintenance, use, and safety of public roads and highways, including the rights and responsibilities of authorities and road users.
-
D.
transportation funding measure
A transportation funding measure is a policy instrument, often a ballot initiative or legislative act, that authorizes and allocates dedicated revenue sources to plan, build, operate, and maintain transportation infrastructure and services.
-
E.
transportation funding authorization act
A transportation funding authorization act is a legislative measure that approves and allocates financial resources for the planning, construction, operation, and maintenance of transportation infrastructure and related programs over a specified period.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8482884481908eccdfdf64d6fbf7 |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 8:06 p.m.