Triple
T9557524
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Central station |
E230577
|
entity |
| Predicate | isOnCorridor |
P1018
|
FINISHED |
| Object |
Red Line trunk between Alewife and Ashmont/Braintree
The Red Line trunk between Alewife and Ashmont/Braintree is the central, heavily used core segment of Boston’s MBTA Red Line that carries trains through key downtown and Cambridge stations before the line branches south.
|
E806433
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Red Line trunk between Alewife and Ashmont/Braintree | Statement: [Central station, isOnCorridor, Red Line trunk between Alewife and Ashmont/Braintree]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Red Line trunk between Alewife and Ashmont/Braintree Context triple: [Central station, isOnCorridor, Red Line trunk between Alewife and Ashmont/Braintree]
-
A.
Red Line Alewife branch
The Red Line Alewife branch is a segment of Boston's MBTA Red Line rapid transit system that runs through Cambridge and surrounding areas, terminating at Alewife station.
-
B.
MBTA Green Line main line
The MBTA Green Line main line is the core light rail trunk of Boston’s Green Line system, running through central Boston and connecting multiple branches that serve surrounding neighborhoods and suburbs.
-
C.
Franklin/Foxboro Line
The Franklin/Foxboro Line is a Massachusetts Bay Transportation Authority commuter rail route serving Boston and its southwestern suburbs, including Franklin and Foxborough.
-
D.
Middleborough/Lakeville Line
The Middleborough/Lakeville Line is a Massachusetts Bay Transportation Authority commuter rail route serving Boston and southeastern Massachusetts communities including Middleborough and Lakeville.
-
E.
Ashmont–Braintree branch of the Red Line
The Ashmont–Braintree branch of the Red Line is a major rapid transit corridor of Boston’s MBTA system, running south from downtown Boston to the suburbs of Ashmont and Braintree.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Red Line trunk between Alewife and Ashmont/Braintree Triple: [Central station, isOnCorridor, Red Line trunk between Alewife and Ashmont/Braintree]
Generated description
The Red Line trunk between Alewife and Ashmont/Braintree is the central, heavily used core segment of Boston’s MBTA Red Line that carries trains through key downtown and Cambridge stations before the line branches south.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Red Line trunk between Alewife and Ashmont/Braintree Target entity description: The Red Line trunk between Alewife and Ashmont/Braintree is the central, heavily used core segment of Boston’s MBTA Red Line that carries trains through key downtown and Cambridge stations before the line branches south.
-
A.
Red Line Alewife branch
The Red Line Alewife branch is a segment of Boston's MBTA Red Line rapid transit system that runs through Cambridge and surrounding areas, terminating at Alewife station.
-
B.
MBTA Green Line main line
The MBTA Green Line main line is the core light rail trunk of Boston’s Green Line system, running through central Boston and connecting multiple branches that serve surrounding neighborhoods and suburbs.
-
C.
Franklin/Foxboro Line
The Franklin/Foxboro Line is a Massachusetts Bay Transportation Authority commuter rail route serving Boston and its southwestern suburbs, including Franklin and Foxborough.
-
D.
Middleborough/Lakeville Line
The Middleborough/Lakeville Line is a Massachusetts Bay Transportation Authority commuter rail route serving Boston and southeastern Massachusetts communities including Middleborough and Lakeville.
-
E.
Ashmont–Braintree branch of the Red Line
The Ashmont–Braintree branch of the Red Line is a major rapid transit corridor of Boston’s MBTA system, running south from downtown Boston to the suburbs of Ashmont and Braintree.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca847e53a88190a60eed7e02257f10 |
completed | March 30, 2026, 2:11 p.m. |
| NER | Named-entity recognition | batch_69cd99487b4c819086e02e29e37b593f |
completed | April 1, 2026, 10:16 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d15296303c8190adda4b24036d9390 |
completed | April 4, 2026, 6:04 p.m. |
| NEDg | Description generation | batch_69d1539bad8481909f9bd060aa3b651c |
completed | April 4, 2026, 6:08 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69d154567f408190a848eea4ca905fb6 |
completed | April 4, 2026, 6:11 p.m. |
Created at: March 30, 2026, 8:03 p.m.