Triple

T9557318
Position Surface form Disambiguated ID Type / Status
Subject Staffordshire–Shropshire border E230570 entity
Predicate instanceOf P0 FINISHED
Object county boundary C8735 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: county boundary
Context triple: [Staffordshire–Shropshire border, instanceOf, county boundary]
  • A. geographical boundary chosen
    A geographical boundary is a defined line or zone on the Earth's surface that separates distinct political, cultural, or natural regions.
  • B. political boundary
    A political boundary is an officially recognized dividing line that separates the geographic areas of different political entities, such as countries, states, or municipalities, defining the limits of their jurisdiction and authority.
  • C. boundary commission
    A boundary commission is an official body established to examine, define, and recommend changes to political or administrative boundaries, often to ensure fair representation or resolve territorial disputes.
  • D. boundary review
    A boundary review is a systematic evaluation and adjustment of geographic or organizational limits to ensure they remain fair, effective, and fit for current and future needs.
  • E. international-free subnational boundary
    An international-free subnational boundary is an internal administrative or political division within a country that does not coincide with or directly border any international boundary.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847d3be8819099c9dad2a7e786f1 completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 8:03 p.m.