Triple
T9496169
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | proximity to Walt Disney World Resort |
E229010
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | travel convenience factor |
C15962
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: travel convenience factor Context triple: [proximity to Walt Disney World Resort, instanceOf, travel convenience factor]
-
A.
transport model
A transport model is a conceptual or mathematical representation used to simulate and analyze the movement of people, goods, or resources across a network or spatial system under various conditions and constraints.
-
B.
transport hub
A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
-
C.
public transport service feature
chosen
A public transport service feature is a specific characteristic, function, or amenity of a public transportation offering that affects how passengers access, experience, and evaluate the service.
-
D.
park-and-ride facility
A park-and-ride facility is a designated parking area where commuters leave their vehicles and transfer to public transportation for the remainder of their journey.
-
E.
public transit station
A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84753660819098e8d416e89e26ae |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 7:56 p.m.