Triple

T9442259
Position Surface form Disambiguated ID Type / Status
Subject LN1 E227673 entity
Predicate instanceOf P0 FINISHED
Object French high-speed rail line C3787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: French high-speed rail line
Context triple: [LN1, instanceOf, French high-speed rail line]
  • A. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • B. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • C. maglev railway line
    A maglev railway line is a transportation route equipped with magnetic levitation and guidance systems that enable high-speed, low-friction train travel along a dedicated track.
  • D. railway line chosen
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • E. railway network
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca843884488190ad6cbe0153088234 completed March 30, 2026, 2:10 p.m.
Created at: March 30, 2026, 7:50 p.m.