Triple

T9388846
Position Surface form Disambiguated ID Type / Status
Subject Vickers A1E1 Independent E225971 entity
Predicate instanceOf P0 FINISHED
Object prototype tank C26065 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: prototype tank
Context triple: [Vickers A1E1 Independent, instanceOf, prototype tank]
  • A. prototype rocket
    A prototype rocket is an experimental launch vehicle built to test and validate new propulsion, structural, and control technologies before full-scale production or operational deployment.
  • B. prototype bomber aircraft
    A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
  • C. prototype train
    A prototype train is an experimental or pre-production railway vehicle built to test and refine new technologies, designs, or performance features before full-scale manufacturing and deployment.
  • D. research prototype
    A research prototype is an early, often experimental implementation of a concept or system created to explore feasibility, validate ideas, and gather feedback before full-scale development.
  • E. unbuilt aircraft project
    An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca842e9dcc8190a264119e683cfe04 completed March 30, 2026, 2:09 p.m.
Created at: March 30, 2026, 7:45 p.m.