Triple

T9388435
Position Surface form Disambiguated ID Type / Status
Subject Mark 8 torpedo E225960 entity
Predicate continuedService P69802 FINISHED
Object post–World War II — LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: post–World War II | Statement: [Mark 8 torpedo, continuedService, post–World War II]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: continuedService
Context triple: [Mark 8 torpedo, continuedService, post–World War II]
  • A. continuedInServiceOn chosen
    Indicates that an entity remained active, operational, or in use beyond a specified point in time or event.
  • B. continuedBy
    Indicates that one entity carries on, extends, or resumes the activity, process, or sequence initiated by another entity.
  • C. mainUseContinued
    Indicates that the primary use or function of something persists or remains in effect over a subsequent period.
  • D. primaryContinuityOf
    Indicates that one entity serves as the main or principal continuation or extension of another entity in a sequence or process.
  • E. continuedOnNetwork
    Indicates that an entity (such as a show, series, or program) remained in production or broadcast on the same network beyond a given point in time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca842e9dcc8190a264119e683cfe04 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd50d6e5f081908102909cb4cbb649 completed April 1, 2026, 5:07 p.m.
PD Predicate disambiguation batch_69cca53bd6ec81909bf403ce304e5c08 completed April 1, 2026, 4:55 a.m.
Created at: March 30, 2026, 7:45 p.m.