Triple
T9372023
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Beatles Anthology production work |
E225552
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | music production project |
C11200
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: music production project Context triple: [The Beatles Anthology production work, instanceOf, music production project]
-
A.
music production software
Music production software is a digital toolset that enables users to compose, record, edit, mix, and master audio to create complete musical works.
-
B.
record production project
chosen
A record production project is a coordinated endeavor that plans, organizes, and manages all creative, technical, and logistical activities required to produce and deliver a finished recorded music release.
-
C.
music workstation
A music workstation is an integrated electronic instrument that combines sound generation, sequencing, recording, and editing tools to compose, arrange, and produce music.
-
D.
beatmaker
A beatmaker is a music creator who composes and arranges rhythmic and melodic patterns, often using digital tools, to form the instrumental backbone of songs and tracks.
-
E.
production music catalog
A production music catalog is a curated collection of pre-cleared musical works organized for easy licensing and use in media such as film, television, advertising, and online content.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca842cbddc819099d71ecec48cf9e5 |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 7:43 p.m.