Triple

T9297920
Position Surface form Disambiguated ID Type / Status
Subject Lockheed A-12 program E223686 entity
Predicate aircraftProduced P19267 FINISHED
Object Lockheed A-12 E223687 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lockheed A-12 | Statement: [Lockheed A-12 program, aircraftProduced, Lockheed A-12]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lockheed A-12
Context triple: [Lockheed A-12 program, aircraftProduced, Lockheed A-12]
  • A. Lockheed A-12 chosen
    The Lockheed A-12 was a high-altitude, Mach 3+ reconnaissance aircraft developed in the early 1960s for the CIA as part of the Oxcart program, serving as the secret predecessor to the SR-71 Blackbird.
  • B. Lockheed YF-12
    The Lockheed YF-12 was a high-speed, high-altitude American interceptor prototype developed in the 1960s as a derivative of the A-12/SR-71 family, intended to intercept and destroy enemy aircraft with advanced radar and long-range missiles.
  • C. SR-71 Blackbird
    The SR-71 Blackbird is a long-range, high-altitude, Mach 3+ strategic reconnaissance aircraft developed by Lockheed’s Skunk Works and renowned as one of the fastest air-breathing manned aircraft ever built.
  • D. Lockheed U-2
    The Lockheed U-2 is a high-altitude American reconnaissance aircraft designed for intelligence gathering missions, particularly during the Cold War.
  • E. A-12 reconnaissance aircraft
    The A-12 reconnaissance aircraft was a high-altitude, high-speed spy plane developed by Lockheed's Skunk Works for the CIA as a predecessor to the SR-71 Blackbird.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: aircraftProduced
Context triple: [Lockheed A-12 program, aircraftProduced, Lockheed A-12]
  • A. aircraftModelProduced chosen
    Indicates that a specific aircraft model has been manufactured or produced by a particular entity (such as a company or organization).
  • B. developedAircraft
    Indicates that an entity (such as a person or organization) was responsible for designing, creating, or engineering a particular aircraft.
  • C. appliedToAircraftBuiltBy
    Indicates that something (such as a regulation, modification, or action) is applied specifically to aircraft that were built by a particular manufacturer or builder.
  • D. aircraftConfigurationProduced
    Indicates that a specific aircraft configuration has been manufactured or produced.
  • E. appliedToAircraftDesignedBy
    Indicates that something (such as a component, system, or regulation) is applied to an aircraft that was designed by a specified designer or organization.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8423edb08190bc0c91287a484768 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd089e3ae88190aa4181cdd85a67b8 completed April 1, 2026, 11:59 a.m.
NED1 Entity disambiguation (via context triple) batch_69d1220267848190a02d8c075726c97a completed April 4, 2026, 2:36 p.m.
PD Predicate disambiguation batch_69cc7a5aeb748190afb89c6bbd2a6d6f completed April 1, 2026, 1:52 a.m.
Created at: March 30, 2026, 7:36 p.m.