Triple
T9285831
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Salesforce Transit Center |
E223392
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rooftop park complex |
C8057
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rooftop park complex Context triple: [Salesforce Transit Center, instanceOf, rooftop park complex]
-
A.
park complex
A park complex is a large, planned outdoor area that combines multiple recreational, natural, and community facilities—such as playgrounds, sports fields, gardens, and walking paths—into a unified public space.
-
B.
deck park
A deck park is an elevated public green space constructed over transportation infrastructure, such as highways or rail lines, to reconnect urban areas and provide recreational and environmental benefits.
-
C.
urban park
An urban park is a publicly accessible green space within a city that provides recreational areas, natural scenery, and social gathering places for residents and visitors.
-
D.
rooftop garden
chosen
A rooftop garden is a cultivated green space installed on the roof of a building, typically used for growing plants, improving insulation, and enhancing urban environmental quality.
-
E.
community park
A community park is a public outdoor space designed to provide local residents with areas for recreation, relaxation, social interaction, and connection with nature.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8422ddf881908a3f8f876c9f53aa |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 7:35 p.m.