Triple

T9285522
Position Surface form Disambiguated ID Type / Status
Subject Northwestern Pacific Railroad E223383 entity
Predicate completedThroughRoute P51374 FINISHED
Object 1914 — LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1914 | Statement: [Northwestern Pacific Railroad, completedThroughRoute, 1914]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: completedThroughRoute
Context triple: [Northwestern Pacific Railroad, completedThroughRoute, 1914]
  • A. completedAsThroughRoute
    Indicates that an action or journey was carried out by following a designated through route from start to finish.
  • B. completedAsContinuousRoute
    Indicates that an activity or journey was carried out in one uninterrupted, continuous sequence without breaks or segmentation.
  • C. routeCompleted chosen
    Indicates that a specified route has been fully traversed or finished by the relevant entity or process.
  • D. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • E. completedBefore
    Indicates that one event or action was fully completed prior to the start or completion of another specified event or action.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8422ddf881908a3f8f876c9f53aa completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd081fe8cc8190b6c1b481c7129689 completed April 1, 2026, 11:57 a.m.
PD Predicate disambiguation batch_69cc7a576ec88190bbb787eb82e2e539 completed April 1, 2026, 1:52 a.m.
Created at: March 30, 2026, 7:35 p.m.