Triple

T928135
Position Surface form Disambiguated ID Type / Status
Subject National Highway System E20031 entity
Predicate instanceOf P0 FINISHED
Object transportation network C4130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transportation network
Context triple: [National Highway System, instanceOf, transportation network]
  • A. transport infrastructure network chosen
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • B. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • C. transportation route
    A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
  • D. transportation network company
    A transportation network company is a business that uses digital platforms, typically mobile apps, to connect passengers with drivers who provide on-demand transportation services.
  • E. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493af3dc48190adb7263e6e445ea1 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:40 p.m.