Triple
T9270077
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lunar Observation Center |
E222801
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Islamic moon-sighting facility |
C13172
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Islamic moon-sighting facility Context triple: [Lunar Observation Center, instanceOf, Islamic moon-sighting facility]
-
A.
Islamic month
An Islamic month is one of the twelve lunar-based divisions of the Islamic calendar, beginning with the sighting of the new moon and used to determine religious observances and events in Islam.
-
B.
Islamic calendar
The Islamic calendar is a purely lunar calendar consisting of 12 months of 29 or 30 days each, used primarily to determine the dates of Islamic religious observances and holidays.
-
C.
Islamic centre
chosen
An Islamic centre is a community facility that serves as a hub for religious worship, education, social services, and cultural activities for Muslims.
-
D.
Sunni Islamic university
A Sunni Islamic university is an institution of higher learning that provides academic and religious education grounded in Sunni Islamic theology, law, and tradition.
-
E.
مدينة إسلامية
مدينة إسلامية هي تجمع حضري يتجلى فيه الطابع الإسلامي في بنيته العمرانية وتنظيمه الاجتماعي والثقافي، مستندًا إلى القيم والمبادئ والتشريعات الإسلامية في الحياة اليومية.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca841ffe208190aa7bcffbef2f8379 |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 7:33 p.m.