Triple

T9269980
Position Surface form Disambiguated ID Type / Status
Subject ETCS Level 2 E222799 entity
Predicate abbreviationOf P590 FINISHED
Object European Train Control System Level 2 E222799 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: European Train Control System Level 2 | Statement: [ETCS Level 2, abbreviationOf, European Train Control System Level 2]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: European Train Control System Level 2
Context triple: [ETCS Level 2, abbreviationOf, European Train Control System Level 2]
  • A. European Train Control System
    The European Train Control System (ETCS) is a standardized, interoperable train signaling and control system used across Europe and in high-speed railways worldwide to enhance safety and efficiency.
  • B. ETCS Level 2 chosen
    ETCS Level 2 is an advanced European train control and signalling standard that enables continuous, cab-based train supervision and high-speed, high-capacity railway operations.
  • C. Chinese Train Control System
    The Chinese Train Control System is a standardized, multi-level train control and signalling system used across China’s railways to ensure safe, efficient, and high-speed train operations.
  • D. Siemens Trainguard MT
    Siemens Trainguard MT is a communications-based train control (CBTC) signaling system developed by Siemens for fully automated and driverless metro and urban rail operations.
  • E. Train Protection & Warning System
    Train Protection & Warning System is a British railway safety system designed to automatically stop or slow trains to prevent collisions and signal passed at danger incidents.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca841ffe208190aa7bcffbef2f8379 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd078525308190abfb883123742d3f completed April 1, 2026, 11:54 a.m.
NED1 Entity disambiguation (via context triple) batch_69d09c2ca500819083ef4aa37f3e3a7f completed April 4, 2026, 5:05 a.m.
Created at: March 30, 2026, 7:33 p.m.