Triple

T9255133
Position Surface form Disambiguated ID Type / Status
Subject Irish Sea offshore wind farms E222421 entity
Predicate gridConnectionTo P25653 FINISHED
Object Great Britain electricity transmission system E330070 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Great Britain electricity transmission system | Statement: [Irish Sea offshore wind farms, gridConnectionTo, Great Britain electricity transmission system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Great Britain electricity transmission system
Context triple: [Irish Sea offshore wind farms, gridConnectionTo, Great Britain electricity transmission system]
  • A. South Western Electricity Board
    The South Western Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity across the south-west of England before industry privatization.
  • B. Central Electricity Authority
    The Central Electricity Authority is a statutory body under the Government of India responsible for overseeing and advising on the development, planning, and technical coordination of the country’s power sector.
  • C. Southern Electricity Board
    The Southern Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity to consumers in the southern part of England before industry privatization.
  • D. Central Electricity Generating Board chosen
    The Central Electricity Generating Board was the state-owned body responsible for electricity generation and bulk transmission in England and Wales from the late 1950s until privatization in the early 1990s.
  • E. British Electricity Authority
    The British Electricity Authority was the nationalized body responsible for generating and supplying electricity in Great Britain in the early post-World War II period.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gridConnectionTo
Context triple: [Irish Sea offshore wind farms, gridConnectionTo, Great Britain electricity transmission system]
  • A. gridInterconnection
    Indicates a connection or linkage between electrical grids that allows power exchange or coordinated operation.
  • B. gridConnectionAgreementWith
    Indicates an agreement establishing the terms and conditions under which one party is connected to another party’s electrical grid.
  • C. hasGridConnection chosen
    Indicates that an entity is connected to an electrical grid, enabling it to receive or supply grid-based power.
  • D. gridConnectionCountry
    Indicates that an entity’s electrical grid is connected to, or integrated with, the power grid of a specified country.
  • E. gridConnectionCompletionDate
    Indicates the date on which a connection to the electrical grid is fully completed and becomes operational.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca841e4cd481908e738c74e958eaea completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd06b3c314819096632b8263288aae completed April 1, 2026, 11:51 a.m.
NED1 Entity disambiguation (via context triple) batch_69d09bde36688190bf66669f585dcee7 completed April 4, 2026, 5:04 a.m.
PD Predicate disambiguation batch_69cc7a4e79e48190b3200247f4624867 completed April 1, 2026, 1:52 a.m.
Created at: March 30, 2026, 7:31 p.m.