Triple

T9255111
Position Surface form Disambiguated ID Type / Status
Subject OPW E222420 entity
Predicate instanceOf P0 FINISHED
Object wind farm developer C14998 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: wind farm developer
Context triple: [OPW, instanceOf, wind farm developer]
  • A. wind power facility
    A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
  • B. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • C. renewable energy developer chosen
    A renewable energy developer is an entity or professional that identifies, plans, finances, and constructs projects that generate power from sustainable sources such as solar, wind, hydro, or geothermal energy.
  • D. windmill
    A windmill is a structure that converts the kinetic energy of wind into mechanical energy, traditionally used for tasks such as grinding grain, pumping water, or generating electricity.
  • E. hydro-wind power plant
    A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca841e4cd481908e738c74e958eaea completed March 30, 2026, 2:09 p.m.
Created at: March 30, 2026, 7:31 p.m.