Triple

T9232475
Position Surface form Disambiguated ID Type / Status
Subject NACS E221850 entity
Predicate competesWith P1375 FINISHED
Object CHAdeMO E79908 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CHAdeMO | Statement: [NACS, competesWith, CHAdeMO]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CHAdeMO
Context triple: [NACS, competesWith, CHAdeMO]
  • A. CHAdeMO chosen
    CHAdeMO is a fast-charging standard for electric vehicles, originally developed in Japan and widely used for DC rapid charging, particularly by early Nissan and Mitsubishi EV models.
  • B. CCS (Combined Charging System)
    CCS (Combined Charging System) is a widely adopted fast-charging standard for electric vehicles that combines AC and DC charging capabilities in a single connector design.
  • C. Tesla Megacharger
    Tesla Megacharger is a high-power fast-charging system developed by Tesla to rapidly charge its electric Semi trucks for long-haul commercial use.
  • D. NACS (North American Charging Standard, newer North American models)
    NACS (North American Charging Standard) is Tesla’s proprietary fast-charging connector design that has become a de facto standard for newer electric vehicles in North America.
  • E. Ventra
    Ventra is the contactless fare payment system used across Chicago’s public transit network, including buses and trains.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83ed628c8190bc02d641e57f097f completed March 30, 2026, 2:08 p.m.
NER Named-entity recognition batch_69ccee1a7e9881908e0c11f242162017 completed April 1, 2026, 10:06 a.m.
NED1 Entity disambiguation (via context triple) batch_69d077bb5b10819083fd2de3ed7d69a4 completed April 4, 2026, 2:30 a.m.
Created at: March 30, 2026, 7:29 p.m.