Triple

T9223706
Position Surface form Disambiguated ID Type / Status
Subject Little Goose Dam E221625 entity
Predicate reservoirName P13043 FINISHED
Object Lake Bryan E784983 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lake Bryan | Statement: [Little Goose Dam, reservoirName, Lake Bryan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lake Bryan
Context triple: [Little Goose Dam, reservoirName, Lake Bryan]
  • A. Lake Bryan
    Lake Bryan is a popular recreational reservoir near Bryan, Texas, known for activities such as fishing, boating, hiking, and lakeside camping.
  • B. Lake Bryan chosen
    Lake Bryan is a reservoir in Washington State on the Snake River, formed by the impoundment of water behind Little Goose Dam.
  • C. Leesville Lake
    Leesville Lake is a man-made reservoir in south-central Virginia known for its recreational boating and fishing opportunities and its role in regional hydroelectric power generation.
  • D. Lake Horton
    Lake Horton is a reservoir in Fayette County, Georgia, primarily used as a drinking water source and recreational area for activities like fishing and boating.
  • E. Lake James
    Lake James is a man-made reservoir in western North Carolina known for its clear waters, recreational opportunities, and role in regional hydroelectric power generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83ec8db08190a9110df8232885d2 completed March 30, 2026, 2:08 p.m.
NER Named-entity recognition batch_69ccda7903208190b4e29a1591aab78a completed April 1, 2026, 8:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69d0779de5a88190b6a9266c976e05b1 completed April 4, 2026, 2:29 a.m.
Created at: March 30, 2026, 7:28 p.m.