Triple

T9191514
Position Surface form Disambiguated ID Type / Status
Subject Hiroshima City Museum of Contemporary Art (competition proposal / influence) E220598 entity
Predicate instanceOf P0 FINISHED
Object conceptual architectural work C3256 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: conceptual architectural work
Context triple: [Hiroshima City Museum of Contemporary Art (competition proposal / influence), instanceOf, conceptual architectural work]
  • A. architectural work
    An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
  • B. architectural design chosen
    Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
  • C. architectural consulting project
    An architectural consulting project is a professional engagement in which architects analyze client needs, evaluate existing conditions, and develop strategic design recommendations, plans, and guidance to inform and optimize building or spatial development decisions.
  • D. architectural practice
    An architectural practice is a professional organization or firm that provides design, planning, and consulting services for the creation, alteration, and evaluation of built environments.
  • E. architectural space
    Architectural space is the intentionally designed three-dimensional environment shaped by physical elements, proportions, light, and materials to support and influence human activities and experiences.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83e7ba70819088b74866d9da2c30 completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:24 p.m.