Triple

T9147747
Position Surface form Disambiguated ID Type / Status
Subject Thames and Medway Canal E219500 entity
Predicate instanceOf P0 FINISHED
Object 19th-century canal C20963 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 19th-century canal
Context triple: [Thames and Medway Canal, instanceOf, 19th-century canal]
  • A. 19th-century infrastructure chosen
    19th-century infrastructure encompasses the transportation, communication, and utility systems—such as railways, canals, telegraph networks, roads, and early urban services—built during the 1800s that enabled industrialization and expanded economic and social connectivity.
  • B. 19th-century bridge
    A 19th-century bridge is a transportation structure built during the 1800s that typically reflects the era’s industrial advances in materials and engineering, such as iron, steel, and improved masonry techniques.
  • C. baroque waterway
    A baroque waterway is an ornately designed canal or watercourse, often integrated into grand landscapes or urban plans, characterized by elaborate curves, decorative features, and dramatic visual perspectives typical of the Baroque style.
  • D. canal aqueduct
    A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
  • E. 19th-century era
    The 19th-century era is a historical period from 1801 to 1900 characterized by rapid industrialization, political revolutions, imperial expansion, and significant social, scientific, and cultural transformations worldwide.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83e121dc81909912bd66953081c5 completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:20 p.m.