Triple
T9146479
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Starnberg pier |
E219468
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | lakeside promenade |
C19040
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: lakeside promenade Context triple: [Starnberg pier, instanceOf, lakeside promenade]
-
A.
lakeside park
A lakeside park is a public recreational area situated along the shore of a lake, offering scenic views, outdoor activities, and natural habitats for visitors to enjoy.
-
B.
lakeside community
A lakeside community is a residential area situated along the shore of a lake, where homes, amenities, and social life are oriented around access to and enjoyment of the waterfront environment.
-
C.
freshwater lake shoreline
A freshwater lake shoreline is the dynamic boundary zone where land meets a non-saline, inland body of standing water, encompassing the physical edge, adjacent shallow waters, and immediate upland areas influenced by the lake.
-
D.
urban promenade
An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
-
E.
waterfront street
chosen
A waterfront street is a public roadway or pedestrian thoroughfare that runs directly alongside a body of water, often featuring views, access points, and amenities oriented toward the shoreline.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83e121dc81909912bd66953081c5 |
completed | March 30, 2026, 2:08 p.m. |
Created at: March 30, 2026, 7:20 p.m.