Triple
T9108284
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Miranda de Ebro |
E218530
|
entity |
| Predicate | railwayJunctionFor |
P14468
|
FINISHED |
| Object |
Barcelona–Vigo railway
The Barcelona–Vigo railway is a major Spanish rail line that traverses the country from the Mediterranean city of Barcelona to the Atlantic city of Vigo, connecting numerous regional hubs along its route.
|
E782448
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Barcelona–Vigo railway | Statement: [Miranda de Ebro, railwayJunctionFor, Barcelona–Vigo railway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Barcelona–Vigo railway Context triple: [Miranda de Ebro, railwayJunctionFor, Barcelona–Vigo railway]
-
A.
Madrid–Barcelona railway
The Madrid–Barcelona railway is a major Spanish rail line linking the capital Madrid with the northeastern city of Barcelona, serving as one of the country’s principal passenger and freight corridors.
-
B.
Madrid–Valencia railway
The Madrid–Valencia railway is a major Spanish rail line connecting the nation’s capital with the Mediterranean port city of Valencia, serving as an important corridor for both passenger and freight transport.
-
C.
Madrid–Hendaye railway
The Madrid–Hendaye railway is a major Spanish rail line that connects the capital Madrid with the French border at Hendaye, serving as a key north–south transport corridor.
-
D.
Madrid–Alicante railway
The Madrid–Alicante railway is a major Spanish rail line connecting the capital Madrid with the Mediterranean coastal city of Alicante, serving as an important corridor for both passenger and freight transport.
-
E.
Madrid–Andalusia railway
The Madrid–Andalusia railway is a major rail line in Spain that connects the capital, Madrid, with the southern region of Andalusia, serving as a key corridor for both passenger and freight transport.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Barcelona–Vigo railway Triple: [Miranda de Ebro, railwayJunctionFor, Barcelona–Vigo railway]
Generated description
The Barcelona–Vigo railway is a major Spanish rail line that traverses the country from the Mediterranean city of Barcelona to the Atlantic city of Vigo, connecting numerous regional hubs along its route.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Barcelona–Vigo railway Target entity description: The Barcelona–Vigo railway is a major Spanish rail line that traverses the country from the Mediterranean city of Barcelona to the Atlantic city of Vigo, connecting numerous regional hubs along its route.
-
A.
Madrid–Barcelona railway
The Madrid–Barcelona railway is a major Spanish rail line linking the capital Madrid with the northeastern city of Barcelona, serving as one of the country’s principal passenger and freight corridors.
-
B.
Madrid–Valencia railway
The Madrid–Valencia railway is a major Spanish rail line connecting the nation’s capital with the Mediterranean port city of Valencia, serving as an important corridor for both passenger and freight transport.
-
C.
Madrid–Hendaye railway
The Madrid–Hendaye railway is a major Spanish rail line that connects the capital Madrid with the French border at Hendaye, serving as a key north–south transport corridor.
-
D.
Madrid–Alicante railway
The Madrid–Alicante railway is a major Spanish rail line connecting the capital Madrid with the Mediterranean coastal city of Alicante, serving as an important corridor for both passenger and freight transport.
-
E.
Madrid–Andalusia railway
The Madrid–Andalusia railway is a major rail line in Spain that connects the capital, Madrid, with the southern region of Andalusia, serving as a key corridor for both passenger and freight transport.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83db7448819090d0a5de842ef2ac |
completed | March 30, 2026, 2:08 p.m. |
| NER | Named-entity recognition | batch_69cca57543448190829853c31e05dd8c |
completed | April 1, 2026, 4:56 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d05449101481908c71475acf59b33c |
completed | April 3, 2026, 11:59 p.m. |
| NEDg | Description generation | batch_69d056aad1308190a2d1bd742465b0ea |
completed | April 4, 2026, 12:09 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69d057488b2481909554dd516a619b10 |
completed | April 4, 2026, 12:11 a.m. |
Created at: March 30, 2026, 7:16 p.m.