Triple

T9107759
Position Surface form Disambiguated ID Type / Status
Subject Certificate of Secondary Education E218518 entity
Predicate takenAtEndOf P48547 FINISHED
Object compulsory secondary schooling — LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: compulsory secondary schooling | Statement: [Certificate of Secondary Education, takenAtEndOf, compulsory secondary schooling]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: takenAtEndOf
Context triple: [Certificate of Secondary Education, takenAtEndOf, compulsory secondary schooling]
  • A. endOf chosen
    Indicates that one entity marks the terminating point or final boundary of another entity, event, or interval.
  • B. typicallyEndsAt
    Indicates that an event, process, or activity most commonly or usually concludes at a particular time, place, or state.
  • C. stoppedAt
    Indicates that an entity has come to a halt or pause at a specific location or point in time.
  • D. concludedAfter
    Indicates that one event or process finishes at a time later than the completion of another event or process.
  • E. tookPlaceUntil
    Indicates that an event or situation occurred continuously or repeatedly up to a specified end time or date, after which it no longer took place.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83db7448819090d0a5de842ef2ac completed March 30, 2026, 2:08 p.m.
NER Named-entity recognition batch_69cca573da0081909f4afcdb3ac99c53 completed April 1, 2026, 4:56 a.m.
PD Predicate disambiguation batch_69cc65fe5be081909d4470d6317b14a6 completed April 1, 2026, 12:25 a.m.
Created at: March 30, 2026, 7:16 p.m.