Triple

T9076156
Position Surface form Disambiguated ID Type / Status
Subject Superbike World Championship E217488 entity
Predicate instanceOf P0 FINISHED
Object production-based racing series C23514 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: production-based racing series
Context triple: [Superbike World Championship, instanceOf, production-based racing series]
  • A. stock car racing series
    A stock car racing series is an organized competition featuring multiple events where drivers race modified production-based cars under a common rule set across a season to determine overall champions.
  • B. one-make racing series
    A one-make racing series is a motorsport competition in which all drivers race in identical or near-identical vehicles from the same manufacturer to emphasize driver skill over engineering advantages.
  • C. GT racing series chosen
    A GT racing series is a motorsport championship featuring production-based grand touring cars competing in multiple events under standardized technical and sporting regulations.
  • D. racing video game
    A racing video game is an interactive digital game where players control vehicles to compete in speed-based contests on various tracks or environments, often featuring time trials, head-to-head races, and customizable performance or visual options.
  • E. endurance racing series
    An endurance racing series is a motorsport competition consisting of long-duration races where teams of drivers, cars, and crews are tested on speed, reliability, strategy, and stamina over extended distances or time periods.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d6c14c8190bc056d927f00a2a2 completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:12 p.m.