Triple

T9071963
Position Surface form Disambiguated ID Type / Status
Subject municipal markets of Olhão E217388 entity
Predicate instanceOf P0 FINISHED
Object market hall complex C25561 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: market hall complex
Context triple: [municipal markets of Olhão, instanceOf, market hall complex]
  • A. municipal hall
    A municipal hall is a public building that houses the offices and meeting spaces of a local government, serving as the administrative and civic center of a municipality.
  • B. museum building complex
    A museum building complex is a coordinated group of structures and spaces designed to collect, preserve, exhibit, and interpret cultural, historical, artistic, or scientific artifacts for public education and enjoyment.
  • C. civic building complex
    A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
  • D. royal stables complex
    A royal stables complex is an organized ensemble of buildings and yards designed to house, train, and maintain horses and related equipment for a royal household’s transportation, ceremonial, and military needs.
  • E. civic palace
    A civic palace is a grand, often monumental public building that houses key municipal or governmental functions and serves as a symbolic center of civic authority and community life.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d6c14c8190bc056d927f00a2a2 completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:12 p.m.