Triple
T9000273
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sony WM-DD9 |
E215022
|
entity |
| Predicate | buildQuality |
P85610
|
FINISHED |
| Object | high |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: high | Statement: [Sony WM-DD9, buildQuality, high]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: buildQuality Context triple: [Sony WM-DD9, buildQuality, high]
-
A.
builderStatus
Indicates the current state or condition of a builder in relation to its construction or configuration process.
-
B.
buildTrigger
Indicates that one event, condition, or action initiates or causes the start of a build process.
-
C.
builder
Indicates that an entity is responsible for constructing, creating, or assembling another entity.
-
D.
helpsBuild
Indicates that one entity assists or contributes to the construction, creation, or development of another entity.
-
E.
builtAgainst
Indicates that one structure or object is constructed directly adjoining and supported by the side or surface of another.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83a12d648190b1e4fe11e8a31890 |
completed | March 30, 2026, 2:07 p.m. |
| NER | Named-entity recognition | batch_69cc6954bb1881908d004a26ba7fe360 |
completed | April 1, 2026, 12:39 a.m. |
| PD | Predicate disambiguation | batch_69cc5edd6cb48190b4fc6d6ca0418056 |
completed | March 31, 2026, 11:55 p.m. |
| PDg | Predicate description generation | batch_69cc5f6dec4081909379bd57c02a5710 |
completed | March 31, 2026, 11:57 p.m. |
Created at: March 30, 2026, 7:05 p.m.