Triple

T8271551
Position Surface form Disambiguated ID Type / Status
Subject North British Railway E193439 entity
Predicate abbreviation P43 FINISHED
Object NBR E193439 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NBR | Statement: [North British Railway, abbreviation, NBR]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NBR
Context triple: [North British Railway, abbreviation, NBR]
  • A. NBR chosen
    NBR is the abbreviation for the North British Railway, a former major Scottish railway company that operated in the 19th and early 20th centuries.
  • B. Neoprene
    Neoprene is a synthetic rubber widely used for its durability, flexibility, and resistance to water, chemicals, and temperature extremes in products like wetsuits, hoses, and gaskets.
  • C. NRB
    NRB is the IATA airport code for the airfield at Naval Station Mayport, a major U.S. Navy base near Jacksonville, Florida.
  • D. NBS
    NBS is the central bank of Slovakia, responsible for monetary policy, financial stability, and regulation of the country’s banking sector.
  • E. NB
    NB is the official two-letter Canada Post abbreviation for the province of New Brunswick.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e14ae481908ffdb822cd2192bc completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb7986f8cc8190a529dda980dd6e98 completed March 31, 2026, 7:36 a.m.
NED1 Entity disambiguation (via context triple) batch_69cd68470f8481909df50c5b6c3cf50c completed April 1, 2026, 6:47 p.m.
Created at: March 30, 2026, 5:50 p.m.