Triple

T7771890
Position Surface form Disambiguated ID Type / Status
Subject Piscataqua River Bridge E179092 entity
Predicate instanceOf P0 FINISHED
Object through-arch bridge C22830 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: through-arch bridge
Context triple: [Piscataqua River Bridge, instanceOf, through-arch bridge]
  • A. bridge approach
    A bridge approach is the section of roadway that transitions between the ground and the main span of a bridge, providing a smooth and stable connection for vehicles and pedestrians.
  • B. brick arch bridge
    A brick arch bridge is a structure composed of one or more curved brick arches that span an obstacle, using the compressive strength of masonry to transfer loads safely to its supports.
  • C. bridge complex
    A bridge complex is a molecular assembly that physically links two distinct cellular structures or regions, facilitating communication, transport, or mechanical coupling between them.
  • D. stone arch bridge
    A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
  • E. bridge network
    A bridge network is a system of interconnected bridges and links that provides multiple paths for traffic or data to travel between nodes, enhancing reliability and load distribution.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f30602c819082ab52cd4af5c592 completed March 27, 2026, 3:16 p.m.
Created at: March 27, 2026, 4:11 p.m.