Triple

T6118810
Position Surface form Disambiguated ID Type / Status
Subject Lagan Weir E136429 entity
Predicate instanceOf P0 FINISHED
Object river control structure C5154 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: river control structure
Context triple: [Lagan Weir, instanceOf, river control structure]
  • A. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • B. lock and dam structure
    A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
  • C. levee system
    A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
  • D. water management structure chosen
    A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
  • E. reservoir dam
    A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0089f851c81909e5e189a617dcff6 completed March 22, 2026, 3:19 p.m.
Created at: March 22, 2026, 4:14 p.m.